In July 2017 a team from OPEC Systems’ Industrial Division performed a tank and line test at the Liberty Service Station site in Gympie, QLD. The testing indicated that the lines were not sound so OPEC recommended they be replaced and additional feeds added for the diesel to every pump position.
Work involved included the Equipment Integrity Test, concrete cutting, excavation, pipework and welding and reinstatement of the pavement.
The customer was delighted with the outcome.
